SOLUTION / MOLD TRANSFER
Move the mold without losing the process.
A mold transfer is not only a shipping decision. Ownership, condition, documentation, machine compatibility, trial history and inspection standards all affect whether production can move safely.
QUICK ANSWER
ABERY reviews transferred molds before scheduling production. The review normally includes ownership and drawing records, recent samples, process and maintenance history, tool condition, machine compatibility, trial requirements and inspection scope.
Incoming transfer review.
- Mold drawing or specification and ownership records.
- Part drawings, revision and critical dimensions.
- Resin, color and material records.
- Recent samples and known defects.
- Last process sheet and maintenance history.
- Tool condition, spare parts and handling records.
- Target machine, volume and validation requirements.
What happens next.
After the incoming review, we confirm the condition and compatibility, agree the qualification trial plan and define the inspection and documentation scope before production release.
PROJECT INTAKE / DFM REVIEW
Send the mold records you have.
We will tell you what can be reviewed before shipment and what needs to be confirmed after arrival.
Tell us where the project is now.
Send the files you have. Missing information can be confirmed during review.
Business inquiries only. For large CAD files, include a secure Google Drive, Dropbox, OneDrive or WeTransfer link, or email tonney@a-mold.com after submitting.