MOLD ENGINEERING · TOOLING · MOLDING · SHENZHEN, CHINA

Injection molds
built for production.Not just the first sample.

ABERY connects part design, DFM, mold structure and toolroom manufacturing through T1 validation and repeat production—with one engineering team accountable for the handoff.

2009Founded in Shenzhen
10,000m²Integrated facility
61Presses · 50–1,600T
3hInitial RFQ response
GF AgieCharmilles EDM system in the ABERY toolroom TOOLROOM / EDM SF / 01
PROJECT EVIDENCEMold design, steel, cooling and machining decisions are checked before the first production cut.
ABS and TPE overmolded smart tool housing made by ABERY

THE HANDOFF IS THE RISK

The hard part is not cutting steel. It is keeping the engineering intent intact.

A mold can pass sampling and still create problems in production when DFM assumptions, T1 decisions, process parameters and inspection criteria are not carried forward. ABERY plans tooling and molding together so the approved part has a production path.

CAD → DFM → MOLD DESIGN → T1 → PROCESS VALIDATION → REPEAT PRODUCTION

CONTROLLED GATES

One project record from RFQ to repeat production.

Explore mold engineering
01

RFQ & file review

Confirm scope, missing inputs and the questions that affect quotation.

02

DFM & Moldflow

Review wall, draft, gates, undercuts, shrinkage, warpage and measurement risk.

03

Detailed quotation

Separate tooling, unit cost, validation, inspection and commercial assumptions.

04

Mold design

Approve structure, runner, cooling, ejection and component choices before steel is cut.

05

Mold manufacturing

Machine, inspect, fit and assemble with defined checkpoints and change control.

06

T1 & sample approval

Run the trial, measure critical features and record open issues before sign-off.

07

Process validation

Establish parameters, inspection standards and the agreed production documents.

08

Repeat production

Control repeat runs, material, inspection, packing and scheduled delivery.

Schneider Electric mold manufacturing case study

CASE FILE / 26 MOLDS · 30 DAYS

When the schedule left no room for late DFM.

Front-loaded Moldflow, premium slide-core components and a team working around the clock turned an impossible timeline into a T0 sign-off. Read what was decided before steel was cut.

Read the case file

FACTORY EVIDENCE

Look closer than the brochure.

Real equipment, named processes and a quality system you can ask us to verify.

GF AgieCharmilles EDM system in the ABERY toolroomINJECTION MOLDING / 50–1,600T
Injection molding machines from 50 to 1600 tons at ABERY50–1,600T / MOLDING
Metrology and inspection equipment at ABERYMETROLOGY / INSPECTION
GF AgieCharmilles HSM 500 EDM systemEDM / TOOLING
ABERY facility exterior in ShenzhenFACILITY / SHENZHEN

PROJECT INTAKE / DFM REVIEW

Send the files you have. We’ll identify what is missing.

Our engineering team reviews the project scope, manufacturability, material, volume and critical requirements before quotation.

3D / 2D filesResin or materialAnnual volumeCritical tolerancesTarget timingQuality documents

Tell us where the project is now.

Send the files you have. Missing information can be confirmed during review.

A-MOLD Project Inquiry

Business inquiries only. For large CAD files, include a secure Google Drive, Dropbox, OneDrive or WeTransfer link, or email tonney@a-mold.com after submitting.

WhatsApp