The sample was approved. Production was not ready.
A two-part ECU housing project combined a PBT+15% GF front panel overmolded with Molex connectors and a Nylon+33% GF box body. The sample passed. Production revealed a different problem.
What went wrong.
Nylon 33% glass fiber shrinks differently in the flow and cross-flow directions. The geometry and process plan did not sufficiently control the resulting warpage in the production environment. A fixture and sample approval process made the first result look more settled than it was.
That gap cost the project money and changed how DFM is treated today. The relevant question is not just “Does the sample fit the fixture?” It is “Does the fixture and inspection plan represent the part as it will be used and produced?”
Material anisotropy and geometry combined to create a production warpage risk.
The sample approval did not fully represent the later production condition.
Confront the process and fixture assumptions, correct the tool and change the DFM standard for similar projects.
Approved samples must be tied to a defined process, measurement method and production condition.
Questions to ask before approving a glass-filled part.
- Are the flow direction, gate location and fiber orientation understood?
- Does the fixture duplicate the end-use mounting condition?
- Are dimensions measured at the production process window?
- What happens to warpage after packing, cooling and environmental exposure?
- Which changes require a new sample approval?
PROJECT INTAKE / DFM REVIEW
Have a glass-filled or warpage-sensitive part?
Send the drawing, material and measurement plan. We will identify the sample and production assumptions that need to be agreed.
Tell us where the project is now.
Send the files you have. Missing information can be confirmed during review.
Business inquiries only. For large CAD files, include a secure Google Drive, Dropbox, OneDrive or WeTransfer link, or email tonney@a-mold.com after submitting.