CASE FILE / STUD FINDER
The project another supplier could not finish.
A North American brand had a failed overmolding tooling project. ABERY reviewed the interface, rebuilt the tooling approach and went on to build more than 100 molds across 13 years.
The handoff from a failed tooling project.
The starting point was not a clean design brief. It was a tooling project that had already failed at another supplier. The customer needed a technical review of what was actually causing the overmolding problem and a production path that could be trusted.
ABERY reviewed the part and mold interface, corrected the approach and built a relationship that expanded across product series and repeat production.
A failed overmolding tool in Zhejiang created schedule and quality pressure for a North American brand.
Look at the interface, mold structure and production conditions rather than repeat the same tooling assumption.
Rescue the project and continue with additional molds, product series and production support.
Long-term programs are won through repeated problem ownership, not one perfect sample.
What to bring when transferring a failed mold.
- Current tool drawings, part drawings and ownership records.
- Recent samples, defects, process settings and inspection data.
- The known failure mode and what has already been tried.
- End-use requirements and the acceptance method.
- A realistic review window before another tool is cut.
PROJECT INTAKE / DFM REVIEW
Have a failed tool or a difficult overmold?
Send the current tool data, samples and failure history. We will tell you what can be reviewed before committing to a rebuild.
Tell us where the project is now.
Send the files you have. Missing information can be confirmed during review.
Business inquiries only. For large CAD files, include a secure Google Drive, Dropbox, OneDrive or WeTransfer link, or email tonney@a-mold.com after submitting.