RESOURCE / IP PROTECTION

Protect CAD with a controlled release, not a promise.

A mold RFQ requires enough geometry to evaluate the part, but it does not require unrestricted access to every file. A clear NDA, minimum-data release and named recipient process reduce avoidable IP risk.

ABERY engineering note
Updated November 20, 2026

The buyer should decide what is shared, with whom, for how long and under what written terms.

QUICK ANSWER

Use a signed NDA, share only the minimum CAD and drawings needed for the review, remove unrelated assemblies and proprietary metadata, use traceable file links, and confirm who inside the supplier can access the files and how they will be stored or deleted.

1. Decide what the supplier actually needs.

A DFM review may need the part geometry, material, critical dimensions, volume and assembly context. It may not need unrelated product assemblies, customer data, full design history or every revision.

Prepare a separate RFQ package rather than forwarding the entire project folder. This reduces accidental disclosure and makes the technical question clearer.

  • Part STEP or native file at the required revision.
  • Relevant 2D drawing with critical dimensions.
  • Material, appearance and inspection requirements.
  • Annual volume and target timing.
  • Only the assembly context needed to understand fit.

2. Put the access terms in writing.

An NDA should identify the legal parties, confidential information, permitted purpose, access scope, duration, return/deletion expectations and the law that applies. The buyer and supplier should both sign before sensitive files are released.

If the supplier uses subcontractors, state whether files may be shared and require the same controls. Do not assume that a generic website statement covers the project.

RecipientName the legal entity and approved users.
PurposeState DFM, quotation, tooling or validation only.
FilesList what is included and what is excluded.
StorageDefine secure location and access control.
DurationState how long the files may be retained.
Return/DeleteDefine when and how files are returned or destroyed.

3. Use traceable file transfer.

Prefer a supplier-controlled upload portal or a secure link with an expiry date. Avoid personal chat attachments for production CAD. Keep a record of the link, recipient, revision and date.

If a cloud drive is used, restrict access to named accounts and remove the link after the review. Do not put CAD in a public folder.

The RFQ can still move.

If the supplier needs more context, add it under the same NDA instead of sending the whole folder.

Open RFQ checklist

4. Protect the production data too.

IP risk continues after the order. Define ownership of the mold, drawings, process sheets, inspection programs, tooling files and spare parts. A tooling payment does not automatically answer every file-rights question.

At project close or transfer, request a complete data handover. State which supplier records may be retained and for what purpose.

  • Mold ownership and transfer rights.
  • CAD, CAM, EDM and inspection files.
  • Process sheets and approved samples.
  • Hot-runner and controller files.
  • Maintenance history and spare-parts list.
  • Return/deletion confirmation for RFQ data.

Questions buyers ask before approving this scope.

Do I need an NDA before sending a 3D model?
Use a written NDA or equivalent confidentiality agreement before releasing non-public geometry. Share only the minimum package needed for the review.
Can I send a STEP file instead of native CAD?
Often a STEP file is enough for DFM and quotation. Native files may be needed later for tooling, but the release should be controlled and agreed.
Who owns the mold design?
Ownership depends on the contract and the supplier’s background IP. State the rights in writing before the order; do not rely on assumptions.
What should happen after a quotation is declined?
The supplier should return or delete confidential files according to the NDA and confirm the action in writing.

Need a project-specific answer?

Send the part, material, volume and stage. We will identify what can be confirmed before quotation or tooling.

Send the project

Keep the scope comparable.

The linked guides are written to support a project-specific supplier and tooling review.

PROJECT INTAKE / CONTROLLED CAD RELEASE

Share the project without losing control of it.

Send only the files needed for the next engineering decision. We will confirm the review scope and the information needed to proceed.

NDA statusPart STEP2D drawingMaterialVolumeSecure link

Tell us where the project is now.

Send the files and context you have. Missing information can be confirmed during review.

A-MOLD Project Inquiry

Business inquiries only. For large files, include a secure Google Drive, Dropbox, OneDrive or WeTransfer link, or email tonney@a-mold.com after submitting.