BUYER GUIDE / SUPPLIER QUESTIONS
Ask questions that reveal how the supplier thinks.
A supplier can claim engineering capability without showing a decision process. These questions help a buyer test how the mold maker handles materials, tool structure, quotations, T1 failures, maintenance and change control.
ABERY engineering note
Updated November 20, 2026
Use the same questions for every shortlisted supplier so answers are comparable.
QUICK ANSWER
Ask how the supplier reviews DFM, selects steel and cavity count, records assumptions, handles T1 failures, documents changes, supports maintenance and transfers the mold. Ask for evidence behind each answer.
1. Engineering and DFM questions.
Start with the supplier’s actual workflow from CAD to tool release. A strong answer identifies inputs, outputs, review owners and the decisions that must be approved before steel is cut.
Ask for a sanitized DFM report and one example where the review changed the design or tool plan.
- Who reviews the part and what software is used?
- Which part features trigger a formal DFM or Moldflow review?
- How are gate, cooling and ejection options compared?
- What happens when the drawing and 3D model conflict?
- How are assumptions and open items recorded?
- Who signs the tooling release?
2. Tooling and quality questions.
Ask how the supplier selects steel, cavity count, hot runner, slides and surface finish. The answer should connect the decision to resin, volume, tool life and maintenance—not only price.
Quality questions should test the records, not the logo. Ask how steel hardness, CMM results, T1 issues and corrective actions are documented.
| Steel | Exact grade, hardness, treatment and wear areas. |
|---|---|
| Cavity | Volume, balance, tool size and maintenance. |
| Runner | Hot/cold, controller, color change and spare parts. |
| Trial | Sample quantity, measurements and issue log. |
| Quality | CMM, FAI, PPAP and certification scope. |
| Maintenance | Interval, spare parts and repair approval. |
3. Commercial and risk questions.
Ask what is included, excluded, assumed and provisional. Request the commercial terms for a T1 failure, design change, additional trial, freight and spare parts.
A supplier that explains the boundary is easier to work with than one that promises everything without a written scope.
Compare the answers.
The strongest answer is a documented example, not a verbal assurance.
Compare quotes4. Questions about handover and transfer.
Mold ownership is only one part of the handover. Ask which drawings, process records, maintenance history and spare parts will be delivered, and what happens if the mold moves later.
If the supplier cannot support a future transfer, the buyer should know before the order.
- Who owns the mold and tooling files?
- What data is delivered at shipment?
- How is process knowledge preserved?
- What spare parts are recommended?
- What warranty and maintenance terms apply?
- What support is available after transfer?
Questions buyers ask before approving this scope.
What is the first question to ask a mold maker?
Are references enough to verify a supplier?
What answer should make me cautious?
Can I ask for a sample DFM report?
Need a project-specific answer?
Send the part, material, volume and stage. We will identify what can be confirmed before quotation or tooling.
Send the projectContinue the engineering review.
Keep the scope comparable.
The linked guides are written to support a project-specific supplier and tooling review.
PROJECT INTAKE / SUPPLIER EVALUATION
Test the answer against the project.
Send the part, material, volume and tooling scope. We will answer the technical and commercial questions in writing.
Tell us where the project is now.
Send the files and context you have. Missing information can be confirmed during review.
Business inquiries only. For large files, include a secure Google Drive, Dropbox, OneDrive or WeTransfer link, or email tonney@a-mold.com after submitting.