DESIGN GUIDE / RIBS & BOSSES
Ribs add stiffness; they also add flow, cooling and sink risk.
Ribs and bosses are common ways to stiffen a part or create a mounting point, but they create local mass, flow restrictions and potential sink opposite the feature. The design should balance stiffness, filling, cooling, ejection and appearance.
ABERY engineering note
Updated November 20, 2026
There is no universal rib or boss thickness. The resin, nominal wall, load, draft, gate and cosmetic surface determine the acceptable design.
QUICK ANSWER
Review the nominal wall, rib thickness, root radius, height, spacing, boss wall, core-out, draft, gate path, cooling and ejection. Use DFM or Moldflow where the risk is high, then inspect sink, fill and dimensions at T1 before production release.
1. Define the structural job.
A rib may add stiffness, support a surface, guide assembly or protect a component. A boss may receive a screw, insert, pin or connector. The structural purpose determines how much material is needed.
Adding material is not always the best way to add strength. Rib layout, depth, spacing and load direction can matter more than a thick local section.
| Load | Bending, impact, screw or assembly. |
|---|---|
| Geometry | Thickness, height, root and spacing. |
| Draft | Release from core or cavity. |
| Gate | Packing access and flow direction. |
| Cooling | Heat removal from local mass. |
| Appearance | Sink and witness marks. |
2. Control the rib-to-wall relationship.
A rib root that is too thick can create a heavy section and sink on the opposite surface. A rib that is too thin may be difficult to fill or may not provide the intended stiffness.
The exact relationship depends on the resin and geometry. The design should use radii and transitions rather than a sharp, abrupt mass. Review the rib height and spacing with the flow and cooling plan.
- Nominal wall and rib thickness.
- Root radius and transition.
- Rib height and draft.
- Rib spacing and cooling access.
- Flow direction and gate location.
- Sink boundary on the visible surface.
3. Design bosses for assembly and release.
A boss may need a cored hole, insert, thread or support rib. The boss wall should be reviewed against the load and the shrinkage risk. A thick solid boss is usually more difficult to cool and pack.
Draft, core support, gate access and ejection should be considered together. An insert boss may need additional wall, but that wall changes shrinkage and assembly stress.
| Boss type | Screw, insert, pin or locating feature. |
|---|---|
| Wall | Load and shrink balance. |
| Core | Support, draft and cooling. |
| Root | Radius and surrounding ribs. |
| Gate | Packing access and weld line. |
| Function | Pull-out, torque or fit. |
4. Check filling and sink before steel.
Ribs and bosses can cause the flow front to split, create weld lines or arrive at the feature after the gate has begun to freeze. The result can be a short shot, weak weld or sink.
A short-shot or Moldflow review can show whether the feature fills and packs. If the feature is in a thick section, cooling may be the bigger constraint.
- Fill pattern and weld line.
- Pressure at the feature.
- Gate freeze and packing.
- Cooling at ribs and bosses.
- Sink and void risk.
- Ejection and release.
5. Validate the molded feature.
Inspect the visible surface for sink, the section for voids if relevant, and the assembly feature for fit or strength. Check the dimensions in the agreed condition.
If the rib or boss changes after T1, review the wall, gate, cooling and support before changing only the process.
- Sink and visible surface.
- Dimensional and assembly result.
- Functional load or torque.
- Weld-line condition.
- Process window and cooling.
- Change and revalidation trigger.
Questions buyers ask before approving this scope.
How thick should a rib be?
Why do bosses cause sink?
Can a boss be solid?
How should ribs and bosses be measured?
Need a project-specific answer?
Send the part, material, volume and stage. We will identify what can be confirmed before quotation or tooling.
Send the projectContinue the engineering review.
Keep the scope comparable.
The linked guides are written to support a project-specific supplier and tooling review.
PROJECT INTAKE / RIB & BOSS REVIEW
Send the wall map and structural function.
We will review fill, sink, cooling, draft and assembly risk before the design is frozen.
Tell us where the project is now.
Send the files and context you have. Missing information can be confirmed during review.
Business inquiries only. For large files, include a secure Google Drive, Dropbox, OneDrive or WeTransfer link, or email tonney@a-mold.com after submitting.