A T1 report should make the next decision obvious.
A T1 trial is not a sample delivery. It is the first measured decision gate for the mold, process and part. The report should show what ran, what was measured, what failed and what happens next.
ABERY engineering note
Updated November 20, 2026
The best report is not the longest one. It is the one that lets engineering, quality and sourcing approve or reject the next step from the same record.
QUICK ANSWER
A useful T1 report includes the mold and machine setup, material lot, process parameters, sample quantity, cavity identification, dimensional layout, appearance result, functional checks, open issues, corrective actions and the approval decision.
1. Identify the trial condition.
The report should identify the mold, part, resin, color, machine, trial date and revision. If the trial used a temporary insert, alternate steel, substitute resin or short-run process, that deviation must be visible.
Without the material and machine identity, a later comparison becomes guesswork.
- Part number and drawing revision.
- Mold number and cavity layout.
- Machine tonnage and injection unit.
- Resin grade, lot and color.
- Trial date and participants.
- Target process window and actual settings.
2. Record the process and samples.
Include shot size, transfer, injection speed, packing pressure/time, cooling time, melt and mold temperatures and cycle time. Record the sample quantity and which cavities were sampled.
If the trial is still being developed, distinguish the baseline condition from the optimized condition. Do not present a hand-picked shot as the production process.
| Process record | Actual settings, alarms and deviations. |
|---|---|
| Samples | Quantity, cavity ID, time in run and photos. |
| Material | Lot, drying record, regrind and color. |
| Appearance | Lighting, viewing area, texture and color boundary. |
| Dimensions | Features, method, fixture and environment. |
| Function | Assembly, leak, fit, strength or other tests. |
3. Separate issue, root cause and action.
A defect list is not a corrective-action plan. Each issue should identify the observed condition, suspected cause, owner, action, target date and revalidation requirement.
If the T1 result is not approved, say so. A clear rejection protects the customer and the supplier from a false production release.
- Issue description and severity.
- Evidence and affected cavities.
- Root-cause status.
- Action and responsibility.
- Retrial or measurement plan.
- Approval status and sign-off.
4. A practical acceptance package.
Attach the dimensional report, appearance sample record, process sheet, material records and any functional test. If the customer requires FAI or PPAP, define the level and evidence before T1.
The production release should reference the approved process window—not only one sample.
Keep the revision.
Every T1 report should identify the drawing, process and tool revision it represents.
Review T1 processQuestions buyers ask before approving this scope.
What does T1 mean?
How many samples should a T1 report include?
Can production be released from a T1 sample?
What if the T1 sample fails?
Need a project-specific answer?
Send the part, material, volume and stage. We will identify what can be confirmed before quotation or tooling.
Send the projectContinue the engineering review.
Keep the scope comparable.
The linked guides are written to support a project-specific supplier and tooling review.
PROJECT INTAKE / T1 REVIEW
Turn the trial into a decision record.
Send the part, mold, material, process data and current sample result. We can help define the evidence needed for the next approval step.
Tell us where the project is now.
Send the files and context you have. Missing information can be confirmed during review.
Business inquiries only. For large files, include a secure Google Drive, Dropbox, OneDrive or WeTransfer link, or email tonney@a-mold.com after submitting.