QUALITY / PPAP SUPPORT
PPAP is an evidence package, not a certificate.
Production Part Approval Process is a customer-defined approval framework used to show that a manufacturing process can produce parts that meet the drawing, specification and agreed production conditions. The required elements and submission level vary by customer and industry.
ABERY engineering note
Updated November 20, 2026
ABERY is ISO 9001:2015 certified and supports agreed PPAP documentation where the project scope and customer requirements fit. ABERY is not IATF 16949 certified.
QUICK ANSWER
Start with the customer’s PPAP manual, submission level and drawing revision. Build the package around the actual production process, including dimensional results, material and performance evidence, process records, sample approval and open-issue closure. Do not assume a generic checklist replaces the customer requirement.
1. Establish the customer requirement first.
PPAP requirements are often defined by an automotive or industrial customer manual, a submission level and a specific approval form. The supplier needs the drawing revision, material specification, special characteristics, sample quantity, test methods, submission level and any customer-specific additions.
A generic “PPAP certificate” is not a substitute for the package. Confirm who approves the submission, what is required at each stage and whether the customer requires a production trial at the final manufacturing location.
| Drawing | Approved revision and all critical characteristics. |
|---|---|
| Submission level | Customer-defined evidence package and sample requirement. |
| Process | Production equipment, tooling, process sheet and controls. |
| Material | Grade, certificate, performance and traceability evidence. |
| Inspection | Dimensional results, fixtures and measurement method. |
| Approval | PSW or customer form and authorized sign-off. |
2. Map the evidence to the production process.
The dimensional results should come from production parts made under the proposed process, not from a hand-built sample that will never be repeated. Record the machine, tool, cavity, material lot, process window, inspection fixture and sample identification.
Material certificates, performance test reports and appearance approvals should be traceable to the same submission. If a test is subcontracted, state the laboratory and the report reference. Do not place an unrelated certificate in the package without explaining its scope.
Keep revisions visible.
A clean PPAP record shows which drawing, process and material revision was approved.
Build the FAI record3. Use the core quality tools where required.
Depending on the customer requirement, the package may include a process flow, PFMEA, control plan, measurement-system analysis, capability studies, sample parts and a part submission warrant. The depth should reflect the risk and the customer’s instructions, not a copied template.
The control plan should describe what is checked in production, how often, with what equipment and what happens when a result is out of limit. A plan that lists a dimension but not the method or reaction plan is difficult to audit and easy to ignore.
- Process flow and production sequence.
- PFMEA where required by the customer.
- Control plan linked to special characteristics.
- Measurement-system and capability evidence where applicable.
- Appearance and material approvals.
- Sample parts, master sample and traceability.
4. Close open issues before submission.
A PPAP package should show the resolution of dimensional, material, appearance or process findings. If an item is open, the submission should say so clearly rather than hiding it in a general report. The customer may accept an interim submission, but the conditions and next review date must be written.
Check that corrective actions have been implemented in the production process, not only written into a document. The next production run should use the approved process sheet and the same measurement method.
- Open issue and owner.
- Containment and correction.
- Root cause and verification.
- Drawing or specification impact.
- Approval status and expiry.
- Next review or resubmission date.
5. Verify the package at handover.
Before shipment, confirm the package is complete for the agreed level, the files are legible, the samples are identified and the customer approval status is recorded. Keep a controlled copy with the project and provide the customer with the requested submission format.
If the mold or production location later changes, review whether the customer requires a new submission. A PPAP approval belongs to a defined process and location, not only to a part number.
Scope the claim accurately.
Ask the supplier which certifications and PPAP elements it can support for the specific project. Do not infer IATF certification from a PPAP request.
Review quality scopeQuestions buyers ask before approving this scope.
What is PPAP?
Does ABERY provide PPAP?
Are PPAP samples the same as T1 samples?
What should I send with a PPAP request?
Need a project-specific answer?
Send the part, material, volume and stage. We will identify what can be confirmed before quotation or tooling.
Send the projectContinue the engineering review.
Keep the scope comparable.
The linked guides are written to support a project-specific supplier and tooling review.
PROJECT INTAKE / QUALITY REQUIREMENTS
Define the approval package before production.
Send the customer requirement, drawing revision and quality scope. We will identify the documents and process evidence that need to align.
Tell us where the project is now.
Send the files and context you have. Missing information can be confirmed during review.
Business inquiries only. For large files, include a secure Google Drive, Dropbox, OneDrive or WeTransfer link, or email tonney@a-mold.com after submitting.