CHECKLIST / DFM REVIEW

A DFM review should end with decisions, owners and dates.

A long list of observations is not a DFM process. The review should identify the part and tool risks that can still change cost, quality, tool life or T1, then assign a disposition and an owner for each item.

ABERY engineering note
Updated November 20, 2026

Use this checklist for a new part, a supplier comparison or a T1 failure review. The depth should match the stage and the risk.

QUICK ANSWER

Start with the part, material, volume, critical dimensions, appearance, assembly and target process. Review geometry, draft, undercuts, wall, ribs, bosses, gate, runner, cooling, ejection, venting, steel and measurement. Record each finding as accept, change, verify or open, with an owner and next action.

1. Confirm the input package.

A review is only as reliable as its inputs. The 3D and 2D files should be at the same revision, and the exact resin, color, volume, critical dimensions and appearance boundary should be identified.

If the project is early, label provisional assumptions. A focused review can still be useful, but the buyer should know which decisions are not yet final.

Part3D, 2D, assembly and revision.
MaterialExact grade, filler, color and drying.
VolumeAnnual demand and program life.
QualityCritical dimensions, datum and appearance.
ProcessTarget press and production condition.
CommercialTiming, budget and quotation scope.

2. Review part geometry and release.

Check nominal and local wall, draft, undercuts, ribs, bosses, corners, parting-line options, cosmetic surfaces and assembly features. The review should identify features that cannot be molded, packed or measured reliably.

Do not hide a release problem behind a process assumption. If the CAD has zero draft or a difficult undercut, define the design or tool action before steel.

  • Wall and local mass.
  • Draft and texture.
  • Undercuts and side actions.
  • Parting line and shutoffs.
  • Ribs, bosses and sink risk.
  • Measurement and assembly access.

3. Review gate, runner and cooling.

Gate and runner decisions affect fill, packing, weld lines, cosmetics, fiber orientation and maintenance. Cooling affects cycle, shrinkage and warpage. These decisions should be visible in the same review.

For high-risk parts, compare options with short-shot logic, Moldflow or a controlled trial. The review should state which option is recommended and what evidence supports it.

GateLocation, type, shear and vestige.
RunnerBalance, pressure and color change.
CoolingCircuit layout and thermal balance.
PackingPressure path and gate freeze.
VentingLast-fill area and cleaning.
MaintenanceAccess to wear and service points.

4. Review ejection, steel and measurement.

Ejection should protect the part and support stable dimensions. Steel should reflect resin wear, corrosion, polish and tool life. The measurement plan should match the drawing and the production condition.

A DFM review is not complete if the only output is “part is moldable.” The tool and quality route must be specific enough to quote and validate.

  • Ejection contact and balance.
  • Steel and heat treatment.
  • Slides, lifters and inserts.
  • Surface finish and draft.
  • Datum, fixture and gauge access.
  • T1 and documentation plan.

5. Close the review with an action log.

Each finding should have a disposition: accept, change the part, change the tool concept, verify in Moldflow, verify in T1 or obtain more data. Assign an owner and due date.

The next reviewer should be able to see which assumptions were resolved and which remain open. A clear action log is more useful than a long checklist with no decisions.

FindingWhat can fail, cost more or delay T1.
EvidenceGeometry, material, simulation or trial.
DispositionAccept, change, verify or open.
OwnerBuyer, designer, toolmaker or molder.
Due dateBefore steel, T1 or production.
VerificationDrawing, sample or measured result.

Questions buyers ask before approving this scope.

What is included in a DFM review?
It can include part geometry, material, wall, draft, undercuts, gate, runner, cooling, ejection, steel, surface, measurement and validation. The exact depth depends on the project stage.
Is a checklist enough for DFM?
A checklist helps organize the review, but the output should contain decisions, assumptions, owners and evidence. A list of observations without actions is incomplete.
When should DFM be done?
Before quotation or steel release for a new tool, and before a major correction or transfer. Early review usually gives more options.
What should I send for a DFM review?
Send 3D and 2D files, exact resin, volume, critical dimensions, appearance requirements, target process and the decision you need to make.

Need a project-specific answer?

Send the part, material, volume and stage. We will identify what can be confirmed before quotation or tooling.

Send the project

Keep the scope comparable.

The linked guides are written to support a project-specific supplier and tooling review.

PROJECT INTAKE / DFM REVIEW

Send the part and the decision.

We will turn the input into a focused review of geometry, tooling, process and validation risk.

3D / 2D filesExact resinAnnual volumeCritical featuresAppearanceNext decision

Tell us where the project is now.

Send the files and context you have. Missing information can be confirmed during review.

A-MOLD Project Inquiry

Business inquiries only. For large files, include a secure Google Drive, Dropbox, OneDrive or WeTransfer link, or email tonney@a-mold.com after submitting.